Have questions about raw biogas upgrading, aqueous compression, or site-specific sizing simulations? Speak directly with our executive leadership and chemical engineering specialists.
Say something to start a conversation with our engineering team! We respond to all technical evaluations within one business day.
Fill out the form below and an engineer will respond within one business day.
Key information to prepare for an engineering evaluation and site sizing analysis.
To perform an initial thermodynamic sizing model, our chemical engineering team typically requests your raw gas flow rate (SCFM or Nm³/h), gas inlet pressure, inlet temperature, and feed gas composition (% CH₄, % CO₂, H₂S ppm, and siloxane concentrations).
All technical and commercial inquiries submitted through this form are evaluated directly by our principal chemical engineers. If an NDA is required before exchanging site data or gas composition sheets, our mutual NDA will be executed promptly.
Yes. The PI-CO₂ system installs modularly downstream of any existing anaerobic digester, landfill gas collection manifold, or municipal wastewater facility. It replaces legacy amine towers or membrane skids without modifying your upstream digestion biology.
We respect client confidentiality. Standard mutual Non-Disclosure Agreements (NDAs) are routinely executed prior to analyzing gas chromatography logs, facility schematics, or utility interconnections.
Operating across commercial project management, national laboratory research, and advanced prototyping.
Executive leadership, project financing, commercial engineering, and project deployment coordination.
Core patent development, thermodynamic phase equilibria simulation, and geologic CO₂ storage evaluation.
Automated prototype column fabrication, controls instrumentation, and pilot-scale testing operations.